Project Name Project Location Name of Client Project Status Date of Completion Project Overview
Road Rehabilitation and Overlay work at Lalitpur District Lalitpur DoR On Going   9.303 km Blacktop Road [Dolakha]
Upgrading and Performance Based Maintenance of Roads in Dolakha, Sindhupalchowk and Kavrepalanchowk Dolakha, Sindhupalchowk and Kavrepalanchowk DoLIAR, RCIP On Going   12.083 km road [Dolakha]
12.377 km road [Sindhupalchowk]
18.629 km road [Kavrepalanchowk]
Reconstruction & Rehabilitation of Godamchaur-Godabari-Badikhel-Lele Bhanjyang, Lalitpur Road Lalitpur EEAP, CLPIU On Going   14.4 km road [7 km Asphalt Concrete Paved and 7.4 km Graveled]
Road Safety Works at Sitapati Musikot Road [RSDP] Dang Division Road Office [DRO] -Dang On Going   Ch 52+650 km to Ch 138+120 km Highway
Improvement of Lainchaur-Balaju Road Kathmandu Division Road Office [DRO] -Kathmandu-2 Completed 14.07.2016 Balaju Chowk Asphalt Concrete
140m Rigid Pavement at Sorhakhutte
Supply and Installation of Steel W-Beam Crash Barrier (Road Safety Works) on Sitalpati-Musikot, Chinchhu-Jajarkot & Surkhet-Tallodhungeshwor-Dailekh Road [RSSP] Nepal Foreign Corporation Branch, DOR, Babarmahal, Kathmandu On Going   Road Safety Works
Strengthening of Runway, Taxiway, Apron (Aphalt Concrete) and other associated works at Rara Airport Rara, Mugu Civil Aviation Authority of Nepal Completed 12.04.2016 Asphalt Concrete: 749.43 cu.m
Sub-base: 4571.64 cu.m
Crushed Stone Base: 2248.281 cu.m
Gabion Work: 3990 cu.m
Asphalt Road Maintenance Work on Naubise Piplamod Section of TRP Bharatpur Division Road Office [DRO] -Bharatpur Completed 30.06.2015 Ch 14+400 to Ch 24+400 km
Asphalt Road Maintenance
Bridge Construction Work at Kul Khola, Okhaldhunga Okhaldhunga Local Roads Bridge Programme On Going   Single Span RCC Motorable 20.3 m bridge
Rehabilitation and Upgrading of Road including Footpath & other Road Furniture Works in Singhadurbar Premises  Kathmandu DOR, Kathmandu Valley Road Improvement Project Completed 23.11.2014 Earthworks in Excavation and Filling: 1419.28 cu.m
Graded Crushed Stone Base: 951 cu.m
Asphalt Concrete: 1637.72 cu.m
Improvement of Tinkune-Airport-Gaushala Road Kathmandu [km 0+000 to km 3+617] DOR, Kathmandu Valley Road Improvement Project Completed 23.11.2014 Earthworks in Excavation and Filling: 7129.81 cu.m
Crusher Run Subbase: 2215.92 cu.m
Graded Crushed Stone Base: 4406.71 cu.m
Asphalt Concrete + DBM: [3340.85 + 454.16] cu.m
Asphalt Concrete Road work & Hume Pipe laying work   Varun Developers Pvt. Ltd. Completed 26.09.2013 Asphalt concrete, Hume pipe work
Periodic Maintenance of Birtamod-Chandrgadhi Road, Mechi Highway Damak Eastern Regional Roads Directorate, Damak Completed 24.06.2012 Road work
Periodic Maintenance of East West Highway Damak Eastern Regional Roads Directorate, Damak Completed 24.06.2012 Road work
Periodic Maintenance of Peepalmod-Nagdhunga, Kalanki-Tripureswor-Balaju Ring Road, Balaju Ring Road-Balaju Bypass, Nagdhunga-Tankeswor Kathmandu [km 145+198 to km 147+183] DOR, Program Coordinator, Road Sector Development Project (RSDP) Kathmandu Completed 15.07.2013 Asphalt Concrete/Bituminous Macadam: 2741.77 cu.m
Premix Carpet Work: 40.35 cu.m
Pavement Strengthening & Road Widening Works with Footpath Construction for a Section in Thirbam Marg Kathmandu [km 1+550 to km 3+230] Kathmandu Valley Road Improvement Project Completed 20.12.2012 Earthworks in Excavation: 4931.36 cu.m
Asphalt Concrete + DBM: [3340.85 + 454.16] cu.m
Single Butiminous Surface Dressing: 18790.90 cu.m
Interlocking Tile: 1017.73 cu.m
Hume Pipe Work: 889.90 Rm
Periodic Maintenance of Dumre-Muse Khola (108+220-113+000), Dumre-Bandipur (0+000-8+000) and Khairenitar (PRM)-Bhimad-Ghumarighat (Khaireni Bhimad sector) (0+000-5+000) Pokhara Western Regional Roads Directorate, Pokhara Completed 08.07.2013 Surface Dressing (Bituminous works): 72268 sq.m
Base Course: 684.24 cu.m
Semi Grouting [50mm thick]: 2387.30 sq.m
Premix Patching Works: 15177.19 sq.m
Periodic Maintenance Kotre-Bijayapur Khola(154+540 – 158+500) , Kaligandaki-Waling(87+740 – 118+450) and Pokhara Mu boundary-Prithivi Chowk(178+770 – 183+190) Pokhara Western Regional Roads Directorate, Pokhara Completed 09.07.2012 Surface Dressing (Bituminous works): 224215.61 sq.m
Base Course: 1369 cu.m
Sub Base: 585.43 cu.m
Premix Patching Works: 16598.52 cu.m
Construction and Improvement of Naudanda–Kaskikot-Sarangkot Road Kaski Office of DDC, District Technical Office, Kaski Completed 08.01.2013 Gravelling Work of 11.3 km with Gabion Retaining
Earthworks in Excavation: 20949 cu.m
Sub Grade Preparation: 44018 sq.m
Sub Base Work, Stone Masonry, Gabion Masonary Work
Construction of Motorable RCC Bridge over Madi River Kaski Western Regional Road Directorate, Damauli Completed 24.06.2013 Total Length of 85.95 m with Bridge span = 21m, Open Foundation
Earthworks in Excavation and Filling: 10494.5 cu.m
Concrete Works: 1142.45 cu.m
Periodic Maintenance Work of Pokhara Baglung Road and Pokhara Sarangkot Road Pokhara, Kaski Western Division Road Office No. 2, Pokhara Completed 29.06.2012 Resealing Surface Area: 190675 sq.m
Reconstruction and Rehabilitation Work of Dovilla-Phalebas Rural Road (Package II) Parbat [Ch 8+500 to Ch 15+955] DDC, District Project Office, Parbat Completed 13.05.2012 Earthworks in Excavation: 26067 cu.m
Stone Masonry: 3780 cu.m
Gabion Work: 2340 cu.m
Surface dressing work of Dhakadhai–Bishnupura Road Rupandehi [Ch 0+000 to Ch 7+000] District Technical Office, Rupandehi Completed 03.08.2010 Earthworks: 24955.2 cu.m
Sub Grade Preparation: 26864 sq.m
Sub Base Work: 5404.6 cu.m
First Coat Surface Dressing: 23662.7 sq.m
Second Coat Surface Dressing: 23369.5 sq.m
Surface dressing work of Hatibangai-Marchwar Road Rupandehi [Ch 7+000 to Ch 14+000] District Technical Office, Rupandehi Completed 03.09.2010 Earthworks: 3758.95 cu.m
Sub Grade Preparation: 36989.25 sq.m
Sub Base Work: 6691.7 cu.m
First Coat Surface Dressing: 29618.33 sq.m
Second Coat Surface Dressing: 29366.75 sq.m
Periodic Maintenance Work of Prithvi Highway & Dhumre-Beshisahar Prithivi Highway from km 113+150 to km 121+150
Dumre-Besisahar from km 19+570 to km 26+570
Western Division Road Office No.1 Damauli, Tanahun Completed 13.06.2010 Surface Dressing Work: 73825 sq.m
Stone Masonry Work: 225.61 cu.m
Bituminous Premix: 52.76 cu.m
Bishnumati Link Road Upgrading Sub-Project (Teku Bridge Junction-Sorhakhutte Junction) Kathmandu [km 0+000 to km 2+800] Kathmandu MPC, Urban & Environmental Improvement Project Completed 15.03.2010 2.8 km Road Upgrading
Earthworks in Excavation: 12218.69 cu.m
Road Works, Interlocking Tile Work, Hume Pipe Work, Drain Works
Upgrading of Satbanjh-Gokuleshwor Road (Contract No. RSDP/NCB/SG-07) Baitadi [km 0+000 to km 19+000] Road Sector Development Project, DOR Completed 26.03.2010 19 km Road Upgrading
Earthworks in Excavation: 81705.44 cu.m
Stone Masonry: 11660.54 cu.m
Gabion, Sub-Surface Drainage, Otta Seal, Sand Seal
Upgrading of Satbanjh-Gokuleshwor Road (Contract No. RSDP/NCB/SG-08A) Baitadi [km 19+000 to km 28+700] Road Sector Development Project, DOR Completed 31.12.2009 9.7 km Road Upgrading
Earthworks in Excavation: 46335.48 cu.m
Stone Masonry: 5712.34 cu.m
Gabion, Sub-Surface Drainage, Otta Seal, Sand Seal
Surface dressing work in Ratna Rajmarg (Deurali-Harre) Banke Division Road Office No.3, Banke Completed 14.11.2008 Surface Dressing Work: 72570.10 sq.m
Slurry Seal: 2001.30 sq.m
Shoulder Gravel: 14716.97 sq.m
Road Improvement Component of Mudhe Sanischare – Khandbari Road Sankhuwasabha Project Directorate (ADB), Department of Roads Completed 24.03.2009 Earthworks in Excavation: 31167 cu.m
Bio-Engineering Works: 21522 sq.m
Sub Base Work: 3284 cu.m
Hume Pipe Work: 150 Rm
Construction of Sunkoshi River Bridge   NCCN Completed 09.07.2007 Truss Bridge (Bridge span=48m*2Nos.) with Well Foundation
Bridge Width: 5.25m
Fireline-Lumbini Road
(Contract No. RAIDP/RUP/PCK-B/SL-1/063/64)
Rupandehi DDC, Rupandehi Completed 20.05.2008 Otta Seal Work (Length 7.5 km, Width 6 m)
Fireline-Lumbini Road
(Contract No. RAIDP/RUP/PCK-B/SL-2/063/64)
Rupandehi DDC, Rupandehi Completed 30.05.2008 Otta Seal Work (Length 7.0 km, Width 6 m)
Road Improvement Project, Khimti Hydropower Plant Ramechhap Himal Power Limited Completed 22.09.2006 Road Work, Fencing (Chain Link), Stone Masonry Boundary wall
Pashupati Core Area Development Project Kathmandu NCCN Completed 13.06.2006 Water supply, Drainage, Road & Landscaping Works
Narayanghat-Mugling Highway Rehabilitation Project Dhading [km 8+000 to km 24+000] Central Division Road Office No. 8, Department of Roads Completed 29.04.2006 16 km Highway
Earth Works: 216249.1 cu.m
Stone Masonry: 5309.43 cu.m
Gravelling Work, Base Course, Semi Grouting, Asphalt Concreting, Gabion Retaining Wall Structure
Najdhunga Checking Bay Construction Project
(Contract No. 6/061/62)
Kathmandu Division Road Office, Minbhawan, Kathmandu
Department of Roads
Completed 27.11.2005 Stone Masonry, Gravelling Work, Base Course, Semi Grouting, Asphalt Concreting, Gabion Retaining Wall Structure
Najdhunga Checking Bay Construction Project
(Contract No. 7/061/62)
Kathmandu Division Road Office, Minbhawan, Kathmandu
Department of Roads
Completed 27.11.2005 Stone Masonry, Gravelling Work, Base Course, Semi Grouting, Asphalt Concreting, Gabion Retaining Wall Structure
Chabahil-Gaushala-Baneshwor Chowk Extension and Development Project Kathmandu Division Road Office, Minbhawan, Kathmandu
Department of Roads
Completed 13.12.2005 Semi grouting, Premix. Asphalt Concreting, PCC, Brick Masonry, Stone Masonry