Project Name | Project Location | Name of Client | Project Status | Date of Completion | Project Overview |
---|---|---|---|---|---|
Traffic Safety Works on Gorusinghe – Sandhikharka Road, Arghakhanchi | Arghakhanchi | Road Division Office, Shivapur | On Going | —- | Traffic Safety Works |
Construction of Branch Office Building for Himalayan Bank Limited | Kathmandu | Himalayan Bank Ltd | On Going | —- | RCC Framed Building with Raft Foundation |
Construction of Faecal Sludge Treatment Plant (FSTP) in Birendranagar Municipality, Surkhet District | Surkhet | SNV Nepal | On Going | —- | Faecal Sludge Treatment |
Road Rehabilitation & Overlay Work | Lalitpur | Central Regional Road Directorate | On Going | —- | Road Rehabilitation and Overlay works along with Pot holes repair and patch work/td> |
Construction of Black TOP & Cross Drainage & Side Drain Works on Chakarchauda- Pipara-Gaura-Sisaniyakot Road, Kapilvastu (Ch 0+000 to 12+000) (Contract No: DROSPR/3371234/073/74-131) | Kapilvastu | Division Road Office, Kapilvastu | On Going | —- | Black TOP & Cross Drainage & Side Drain Works |
Construction of Revetment with the use of Semi flexible 3D galvanized mat as a model project work at Left Banl of Bagmati River | Kathmandu | Department of water Resources and Irrigation | On Going | —- | Revetment with the use of Semi flexible 3D galvanized mat |
Upgrading and Performance Based Maintenance of Barabhise-Maneswara-Ghumthang-Bhairabkunda Road | Sindhupalchowk | The Project Manager, Rural Connectivity Improvement Project (RCIP), | On Going | —- | Upgrading and Performance Based Maintenance work |
Upgrading and Performance Based Maintenance of Nayapul-Pawati-Dadakharka Road | Dolakha | The Project Manager, Rural Connectivity Improvement Project (RCIP), | On Going | —- | Upgrading and Performance Based Maintenance work |
Upgrading and Performance Based Maintenance of Dolalghat-Phalate-Kolati-Dhadkharka-Pokharichauri-Gurase Road | Kavrepalanchowk | The Project Manager, Rural Connectivity Improvement Project (RCIP), | On Going | —- | Upgrading and Performance Based Maintenance work |
Construction of New Nuwakot District Hospital | Nuwakot | KOICA | Completed | 2020 | 3 Floored RCC Building Total Area: 38191.65 sq.ft. |
Construction of Police Building in Achham, Surkhet and Dailekh District | Achham, Surkhet and Dailekh | UNOPS | Completed | 2020 | 2 Floored RCC Building on each site |
Construction of College Building at Gopi Krishna Road | Kathmandu | Reliance International Academy Pvt. Ltd. | Completed | 2019 | 3 Floored Building with Basement Total Builtup Area: 28047.15 sq.ft. |
Construction of Jalpadevi School Building and Its allied Works | Sindhupalchowk | Sipradian Sahayata Sanstha | Completed | 2019 | 2 Floored Building Total Builtup Area: 7790.24 sq.ft. |
Construction of Shree Sarada H.S. School Building | Barabishe | Sipradian Sahayata Sanstha | Completed | 2018 | 2 Floored Building Total Builtup Area: 8263.68 sq.ft. |
Construction of Residental Building | Lumbini | SOS Childrens’ Village International | Completed | 2018 | 1.5 Floored Building with Truss Plinth Area: 2100 sq.ft. |
Construction of Social Center | Bhimtar, Sindhupalchowk | SOS Childrens’ Village International | Completed | 2018 | Total Builtup Area: 2461 sq.ft. |
Construction of Shree Shanti Niketan Higher Secondary School | Kavre | SOS Childrens’ Village International | Completed | 2018 | 3 Floored Building Total Builtup Area: 2474.8 sq.ft. |
Extension Work at CV | Jorpati | SOS Childrens’ Village International | Completed | 2018 | 2 Floored Building Plinth Area: 2416 sq.ft. |
Construction of Proposed Shree Bhimeshwori Higher Secondary School | Bhimtar, Sindhupalchok | SOS Childrens’ Village International | Completed | 19.05.2018 | Two 2 Floored School Building and one 3 Floored School Building Total Builtup Area: 8823 sq.ft. |
Construction of Police Building in Kapilvastu and Dang | Kapilvastu and Dang | UNOPS | Completed | 23.06.2018 | 6 Police Buildings |
Construction of Police Building in Rupandehi and Nawalparasi | Rupandehi and Nawalparasi | UNOPS | Completed | 23.06.2018 | 6 Police Buildings [ Five 2 Floored Buildings and one 3 Floored Building] |
Extension of Hotel Building | Dhumbarahi, Kathmandu | Akama Hotel Pvt. Ltd. | Completed | 02.05.2018 | RCC framed structure building |
Construction of Police Building in Siraha and Saptari | Siraha and Saptari | UNOPS | Completed | 12.03.2018 | 4 Police Buildings [ Two 2 Floored Buildings and Two 3 Floored Building] |
Construction of Transitional Office Buildings | Nuwakot, Dhading, Ramechhap, Dolakha, Kabhre, Sindhuli Districts and Kathmandu (PIU) | Earthquake Emergency Assistance Project, Department of Urban Development & Building Construction | Completed | 26.04.2017 | 167 Prefabricated Buildings |
Construction of Disaster Recovery Center | Hetauda | KOICA | Completed | 31.12.2016 | National Data Center Building |
Construction of Foundation and Ground Floor of the Academic Block for Far Western University | Kanchanpur | Far Western University, Bhimdatta Municipality, Kanchanpur | Completed | 2015 | Building |
Construction of Foundation and Ground Floor of the Administrative Block for Far Western University | Kanchanpur | Far Western University, Bhimdatta Municipality, Kanchanpur | Completed | 2015 | Building |
Construction of Head Offce Building Complex | Kamaladi, Kathmandu | Bank of Kathmandu Ltd. | Completed | 2017 | RCC framed structure building |
Construction of Technical cum Administrative Building | Nepalgunj | Nepal Telecom | Completed | 05.06.2015 | Total Builtup Area: 48054.70 sq.ft. |
Construction of Auditorium Building at St. Mary’s High School | Jawalakhel, Lalitpur | St. Mary’s High School | Completed | 30.06.2014 | RCC Framed Structure Building with Steel Truss Roofing 1050 Persons Capacity Auditorium Hall |
Construction of Commercial Building | Baneshwor, Kathmandu | Indra Trade Concern Commercial Building | Completed | 13.06.2015 | Commercial Building |
Construction of Hostel Block for Reliance Public School | Kapan | Reliance International Academy Pvt. Ltd. | Completed | 15.01.2013 | Hostel Building |
Construction of Building of Dr. Bhola Raj Joshi | Nepal | Dr. Bhola Raj Joshi | Completed | 2013 | Building |
Construction of Central Business Park | Thapathali, Kathmandu | Clean Infrastructure Pvt. Ltd. | Completed | 16.09.2013 | RCC Framed Structure Building [Business Park] 1 Basement and 9 Stories Total Floor Area: 150467.84 sq.ft. Basement Area: 21520 sq.ft. |
Construction of Technical cum Administrative Building | Bhairahawa | Nepal Telecom | Completed | 27.02.2013 | RCC Framed Six Storied Building Complex including Basement Structural Glazing and ACP Sheet Cladding on outer wall Total Builtup Area: 48385 sq.ft. Basement Area: 10150 sq.ft. |
Construction of Commercial Building | Naxal, Kathmandu | Nirdhan Utthan Bank Limited | Completed | 01.03.2013 | RCC Framed Structured Building 1 Basement and 5 Stories Basement Area: 3567.27 sq.ft. Total Floor Area: 23100 sq.ft. |
Construction of KUP Complex/ Current Oriental Hotel Extension Project | Lazimpat, Kathmandu | Oriental Hotels Limited (Hotel Radisson) | Completed | 30.05.2012 | RCC Framed Structured Building 1 Basement and 7 Stories Basement Area: 10760 sq.ft. Total Floor Area: 64560 sq.ft. |
Construction of Prestige Apartment Building | Chandole, Kathmandu | Prestige Developers Co. Pvt. Ltd. | Completed | 22.01.2011 | RCC framed structure with double basement and 13 stories |
Construction of Commercial Complex for Mrs. Bindu Bataju | Mrs. Bindu Bataju | Completed | 20.01.2012 | Comercial Complex | |
Construction of Residence of Mrs. Meenu Chheber | Mrs. Meenu Chheber | Completed | 14.06.2011 | Residence Building | |
Construction of Class Room Block | Kapan, Kathmandu | Reliance International Academy Pvt. Ltd. | Completed | 14.05.2011 | Class Room Building |
Construction of New School Building for Gyanodaya Secondary School | Bafal, Kathmandu | Gyanodaya Secondary School | Completed | 01.02.2011 | School Building |
Dismantling, Removing and Construction of Extension Building | Teendhara Premises | Nabil Bank Building | Completed | 2011 | Building Extension |
Construction of Structural & Architectural Work of Club Himalaya at Nagarkot | Nagarkot | Club Himalaya | Completed | 2011 | Hotel Building |
Construction of Office Building for Mercantile Office System | Durbarmarg, Kathmandu | Mr. Sanjib Raj Bhandari | Completed | 11.04.2010 | Traditional type Building Earth Works in Excavation: 2036.31 cu.m. Concrete Works: 1088.60 cu.m. Decorative Traditional Brickwork: 7241.25 Running Meter |
Rehabiliation/ Extension of Bheri Zonal Hospital | Banke, Nepalgunj | Town Development Fund, Baneshwor | Completed | 08.03.2009 | RCC Framed Structure Building with Finishing Water Supply and Sanitary Works Electrification Pavement and Landscaping Earth Works Excavation: 1650.22 cu.m. |
Construction of Machhapuchchhre Tower | Lazimpat, Kathmandu | Machhapuchchhre Bank Ltd. | Completed | 15.02.2009 | RCC Framed Structure Building with Flooring, Painting Supply and Installation of Water Supply and Sanitary Works Aluminium, Metal Work and ACP Cladding Earth Works in Excavation: 810 cu.m. |
Construction of Compound Wall at Biratnagar Eye Hospital | Biratnagar | Sagarmatha Eye Hospital, Lahan | Completed | 18.11.2008 | Earthwork, Stone Masonary Foundation, Brick Wall, Lower/Intermediate/Coping Beams Total Length of Boundary Wall: 1512.60 Running meter |
Rehabilitation/ Extension of Rajapur Primary Health Care Centre | Rajapur, Bardiya | Town Development Fund, Baneshwor | Completed | 01.01.2008 | RCC Framed Structure Building with Finishing Water Supply and Sanitary Works Electrification Pavement and Landscaping |
Refurbishing and New Construction Works for Transit Centre of IOM | Maharajgunj, Kathmandu | IOM, Nepal, UN House, Pulchowk | Completed | 25.02.2008 | Building: Load Bearing Wall, Mild Steel Truss, UPVC Roofing Boundary wall: Brick Wall, MS Post Fence, Concrertina, Chain Link Footpath: 50mm thick Concrete Block (Interlock Tile) Drainage & Water Supply: RCC Hume Pipe Sewer Line, Overhead Water Tank, GI Pipe Line |
New Construction and Renovation Works of IOM | Damak, Jhapa | IOM, Nepal, UN House, Pulchowk | Completed | 14.12.2007 | Building: Load Bearing Wall, Mild Steel Truss, CGI Sheet Roofing Boundary wall: Brick Wall, MS Post Fence, Concrertina, Chain Link |
Amarawati Awas Housing Project | Matatirtha, Kathmandu | Amrawati Awas Pvt. Ltd. | Completed | 14.06.2007 | Cavity Wall, Fairface Brick Wall Retaining Structures, Gabion Walls Sewer Treatment Plant[Horizontal Reed-Bed] Drainage, Water Supply and Road Works Earth Works Excavation: 8438.08 cu.m. |
Construction of Central Office Building Of Nirdhan Utthan Bank Limited | Bhairahawa | Nirdhan Utthan Bank Limited | Completed | 19.10.2004 | RCC Framed Structure with Water Supply, Sanitary, Electrification & Lift Installation |
Construction of Commercial Complex and Maintenance of Convention Centre | Baneshwor, Kathmandu | Birendra International Convention Centre | Completed | 13.10.2000 | Complex is Constructed with RCC Framed Structure including Entire Work |